The Purac Biochem office is the answer to specific client requirements, where the first floor holds general facilities with 2 office floors on top. The intertwining of the two office layers and the separation from the first floor are –literally– expressed through the façade. A flexible middle zone, which acts as a plaza, meets the requirement of an office concept where the communication between employees is encouraged.
The Slimline floor system has been fitted with water pipes (thermal activation) and connected to a heat pump, which replaces traditional air cooling and the suspended ceiling.